Scale up

Building bigger? We've got you.

Going from one gaming PC to a garage data center, or planning a serious GPU farm? We'll quote you the build, help with power and cooling, and onboard every GPU to the Wattlend network.

Earnings calculator

Rough projections. Real numbers vary by region and demand mix.

Net earnings / mo
$1,329
Hardware investment
$15,200
Total power draw
3.6 kW
Payback period
11 months
Garage Data Center

Serious side-business / homelab on steroids

GPUs4 – 16
Hardware budget$25,000 – $75,000
Power draw5 – 25 kW
SpaceCloset rack / single garage bay
Net earnings$500 – $2,500 / month net
Payback period18 – 36 months
  • Multi-GPU workstation or open-frame rack
  • Dedicated 20A or 50A circuit (single-phase OK)
  • Window AC or basic exhaust ventilation
  • 200 Mbps+ symmetric fiber, UPS
  • 1 person to monitor (you, weekly)
Request a Garage Data Center quote →
Data Farm

Full-time business / serious capital allocation

GPUs50 – 500+
Hardware budget$500,000 – $5,000,000
Power draw100 kW – 1 MW
SpaceDedicated building / colo half-rack to full row
Net earnings$15,000 – $150,000 / month net
Payback period24 – 48 months
  • Full racks (8–16 GPUs/rack typical for AI)
  • 3-phase power, dedicated transformer or sub-meter
  • Liquid or dedicated HVAC cooling
  • Gigabit fiber with BGP redundancy
  • On-call ops staff or managed service partner
Request a Data Farm quote →
⚠ Estimates only — not a guarantee

These figures assume 70% utilization at $0.13/kWh after Wattlend's 30% take, with consumer-GPU market rates calibrated to public Vast.ai / RunPod / Salad data. Real earnings vary substantially by region, electricity cost, GPU model demand, network reliability, and platform-side demand fluctuations. Treat these as planning ranges, not commitments. We don't guarantee any specific earnings.

Planning 50+ GPUs? Let's talk.

Anything Data Farm tier (50+ GPUs / 100 kW+) gets a white-glove 30-minute scoping call before we put a build list together. We'll cover power, cooling, network, financing, and timeline. No pitch, just numbers.

What we help with

Build list
Specific CPUs, GPUs, motherboards, PSUs, cooling, and rack hardware — with vendor links and current prices.
Power planning
Wattage budget per machine, breaker sizing, panel upgrade needs, generator/UPS sizing for bigger farms.
Cooling design
From window AC for a closet to dedicated CRAC units for a farm. Heat-load math included.
Networking
Switch + fiber recommendations, BGP setup for multi-homed redundancy on big farms.
Financing intro
Partner lenders for hardware financing on Garage tier; project financing intros on Farm tier.
Onboarding
We pre-image your machines with the Wattlend agent so you plug in, sign in, and earn. No SSH gymnastics.
White-glove (Farm tier)
Dedicated solutions engineer, contract terms, custom SLA, named account manager.
No lock-in
Wattlend is open. Your hardware is yours. Switch to another network or self-host whenever.

Request a quote

Tell us about your project. We'll quote a build and walk you through next steps.

We'll reply within one business day. No spam, no upsells — just numbers and a plan.

© 2026 Wattlend. All rights reserved.